Suppose that a firm has a short-run total cost curve
C(q) = 100 + 20q + q^2
Assume the fixed cost is sunk.
a) What is the short-run marginal cost curve?
b) What is the equation for average variable cost?
c) What is the minimum level of average variable cost?
d) What is the firm's short-run supply curve?