Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Managerial Economics Expert

Weighted-average costing: Normal and abnormal spoilage

Ranka Company manufactures high-quality leather products. The Company's profits hav declined during the past 9 months. Ranka has used unit cost data that were developed 18 months ago in planning and controlling its operations. In an attempt to isolate the causes of poor profit performance, management is investigating the manufacturing operations of each of its products.

 One of Ranka's main products is fie leather belts. The belts are produced in a single, continuous process. During the process, leather strips are sewn, punched and dyed. Buckles are attached by rivets when the belts are 70% complete as to direct labour and overhead (conversion costs). The belts then enter a final finishing stage to conclude the process. Labour and overhead are applied continuously during the process.

                The leather belts are inspected twice during the process: (1) right before the buckles are attached (the 70% point in the process) and (2) at the conclusion of the finishing stage (the 100% point in the process). Ranka uses the weighted-average method to calculate its unit costs. The cost per equivalent unit being used for planning and controlling purposes is $5.35 per unit

The work-in-process inventory consisted of 400 partially completed units on October.

1. The belts were 25% complete as to conversion costs. The costs included in the inventory on October 1 were as follows:

Leather strips                    $1,000

Conversion costs                   300

Total                                $1,300

During October, 7600 leather strips were placed in production. A total of 6800 good leather belts were completed. A total of 300 belts were identified as defective at the two inspection points: 100 at the first inspection (before buckle is attached) and 200 at the final inspection point (after finishing). This quantity of defective belts was considered normal. In addition, 200 belts were removed from the production line when the process was 40% complete as to conversion costs because they had been damaged as a result of a malfunction during the sewing operation. Since this malfunction was considered an unusual occurrence, the spoilage was classified as abnormal. Defective (spoiled) units are not reprocessed and have zero salvage value. The work-in-process inventory on October 31 consisted of 700 belts, which were 50% complete as to conversion costs.

The costs charged to production during October were as follows:

                                Leather strips                                    $20,600

                                Buckles                                              4,550

                                Conversion costs                                20,700

                               Total                                                $45,850

 

Required:

a. Determine the equivalent units for each factor of production.

b. Calculate the cost per equivalent whole unit for each factor of production

c. Determine the assignment of total production costs to the work-in-process inventory and to goods transferred out

d. Calculate the average unit cost of the 6800 good leather belts completed and transferred to finished goods.

Managerial Economics, Economics

  • Category:- Managerial Economics
  • Reference No.:- M9521904

Have any Question?


Related Questions in Managerial Economics

Simulation and agent-based modeling schelling t c 1971

Simulation and Agent-Based Modeling Schelling, T. C. (1971). Dynamic models of segregation. Journal of Mathematical Sociology, 1(2), 143-186. Seminal Retrieved from the Walden Library databases. Discussion: Agent-Based M ...

Discussion explore applications of pert and cpm in the

Discussion: Explore Applications of PERT and CPM in the Public or Non-Profit Organizations PERT is typically used to manage very large projects. In terms of scale, think weapons systems, the development of interstate tra ...

Queuing theory in the public sectordiscussion queuing

Queuing Theory in the Public Sector Discussion: Queuing Theory and Wait Times For this Discussion, you dive deeper into the topic of queuing. To prepare: Review the Learning Resources for the week as they relate to the t ...

I have long thought subway made a monster mistake in their

I have long thought Subway made a MONSTER mistake in their "$5 footlong" campaign, that showed the whole country that they could sell footlong subs for just $5. I think this decreased the value of their brand, and made t ...

Question read three 3 academically reviewed articles on

Question: Read three (3) academically reviewed articles on managerial economics and complete the following activities: (500 words) 1. Summarize all three (3) articles. Please use your own words. No copy-and-paste 2. Disc ...

Assignment - portfolio project for the final project you

Assignment - Portfolio Project For the final project, you will create a case study based on a company of your choice. The case study should include at least 5 of the concepts that we have discussed. The case study should ...

Topic - cost benefit analysis cba discussion benefits and

Topic - Cost Benefit Analysis (CBA) Discussion: Benefits and Shortcomings of Cost Benefit Analysis As mentioned in the Weekly Introduction, cost benefit analysis is one of the most widely used of all public-sector manage ...

Geographic information systems gisassignment short paper

Geographic Information Systems (GIS) Assignment: Short Paper: GIS In the early years of Geographic Information Systems (GIS) technology, mapping was largely limited to public works, and then in the 1990s and early 2000s, ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As