Waterways has two major public-park projects to provide with comprehensive irrigation in one of its service locations this month. Job J57 and Job K52 involve 15 acres of landscaped terrain which will require special-order sprinkler heads to meet the specifications of the project. Using a job cost system to produce these parts, the following events occurred during December 2010.

Raw materials were requisitioned from the company's inventory on December 2 for $5,061; on December 8 for $1,059; and on December 14 for $3,459. In each instance, two-thirds (2/3) of these materials were for J57 and the rest for K52.

Six time tickets were turned in for these two projects for a total amount of 18 hours of work. All the workers were paid $16.50 per hour. The time tickets were dated December 3, December 9, and December 15. On each of those days, 6 labor hours were spent on these jobs, two-thirds (2/3) for J57 and the rest for K52.

The predetermined overhead rate is based on machine hours. The expected machine hour use for the year is 2.112 hours, and the anticipated overhead costs are $840,576 for the year. The machine were used by workers on projects K52 and J57 on December 3, 9, and 15. Six machine hours were used for project K52 (2 each day), and 8.5 machine hours were used for project J57 (2.5 the first day and 3 each of the other days). Both of these special orders were completed on December 15, producing 237 sprinkler heads for J57 and 142 sprinkler heads for K52.

Additional job order activities during this period of time included:

Dec. 1 : Purchased raw materials from Durbin Supply Company on account for $53,200.
Dec. 2 : Issued $40,000 of direct materials from the company's inventory to jobs other than K52 and J57 and $3,000 of indirect materials.
Dec. 12 : Paid Waterways' factory salaries and wages in the amount of $65,000.
Dec. 13 : Paid the factory's water bill of $9,000.
Dec. 18 : Transferred $50,000 of costs from other completed jobs to finished goods.
Dec. 21 : Paid the factory's electric bill of $12,000 for Waterways' factory.
Dec. 31 : Made adjusting entries for the factory that included accrued property taxes of $12,000, prepaid insurance of $8,800, and accumulated depreciation of $16,000.

Instructions

(a) Set up the job cost sheets for Job No. J57 and Job No. K52. Determine the total cost for each manufacturing special order for these jobs. (Round unit cost to nearest cent.)

(b) Journalize the activities from these job cost sheets in the general journal. Also journalize the other costs that occurred during this period of time.

(c) Assuming that Manufacturing Overhead has a debit balance of $3,600, determine whether overhead has been under/over applied and make the adjusting entry.

(d) Why would Waterways choose machine hours as the cost driver for the overhead rather than direct labor cost? What would Waterways be likely to choose as the cost driver for the overhead for the job of installing the irrigation system and why?

Econometrics, Economics

  • Category:- Econometrics
  • Reference No.:- M9482089

Have any Question?


Related Questions in Econometrics

Monte carlo exercisein order to illustrate the sampling

Monte Carlo Exercise In order to illustrate the sampling theory for the least squares estimator, we will perform a Monte Carlo experiment based on the following statistical model and the attached design matrix y = Xβ + e ...

Economics and quantitative analysis linear regression

Economics and Quantitative Analysis Linear Regression Report Assignment - Background - In your role as an economic analyst, you have been asked the following question: how much does education influence wages? The Excel d ...

Basic econometrics research report group assignment -this

Basic Econometrics Research Report Group Assignment - This assignment uses data from the BUPA health insurance call centre. Each observation includes data from one call to the call centre. The variables describe several ...

Question - consider the following regression model for i 1

Question - Consider the following regression model for i = 1, ..., N: Yi = β1*X1i + β2*X2i + ui Note that there is no intercept in this model (so it is assumed that β0 = 0). a) Write down the least squares function minim ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As