Problem One - PLANT-WIDE RATE AND ACTIVITY-BASED COSTING

The comptroller for Douglas Inc. has established the following activity cost pools and cost drivers.

Activity Cost Pool Cost

Budgeted Overhead Cost Driver

Budgeted Level for Cost Driver

Machine setups

$200,000

Number of setups - 160

Materials handling

100,000

Weighted of material - 50,000 kilograms

Waste control

50,000

Weighted of chemicals - 10,000 kilograms

Quality control

75,000

Number of inspection - 300

Other overhead costs

200,000

Machine hours - 20,000

Each order must be a minimum of 1,000 boxes of film chemicals.

The production requirements for each minimum order are as follows:

Machine setups - 5 setups

Material handling - 1,500 kilograms

Waste Control - 200 kilograms

Quality Control - 5 inspections

Other Overhead Costs - 500 machine hours

Required:

1. Calculate the overhead that should be assigned to each minimum order of film chemicals using the above data.

2. Calculate the overhead that should be assigned to each minimum order of film chemicals if Douglas decides to use a single predetermined overhead rate based on machine hours.

Problem Two - PLANT-WIDE RATE AND ACTIVITY-BASED COSTING

Hood Manufacturing Inc. has four categories of overhead. The expected overhead costs for each of the categories for the next year are as follows:

 

Cost

Cost Driver

Expected Activity

Maintenance

$510,000

Machine hours

60,000

Materials handling

250,000

Materials moves

20,000

Setups

60,000

Setups

3,000

Inspection

21,000

Inspection

12,000

Currently, the company applies overhead using a predetermined overhead rate based upon budgeted direct labour hours of 100,000.

The company has been asked to submit a bid on a proposed job. Usuallybids are based upon full manufacturing costs plus a percentage of 10 percent.

Estimates for the proposed job are as follows:

Direct materials - $30,000

Direct labour - $24,000

Number of direct labour hours - 8,000

Number of material moves - 100

Number of inspections - 120

Number of setups - 24

Number of machine hours - 4,000

Required:

1. If the company used activity-based cost drivers to assign overhead, calculate the bid price of the proposed job.

2. If the company used direct labour hours as the cost driver, calculate the bid price of the proposed job.

Problem Three - NON-VALUE-ADDED COSTS, ACTIVITY COSTS, ACTIVITY COST REDUCTION

BobDaly, vice president of Dwan Company (a producer of a variety of plastic products), has been supervising the implementation of an ABC management system. One ofBob's objectives is to improve process efficiency by improving the activities that define the processes. To illustrate the potential of the new system to the president, Bob has decided to focus on two processes: production and customer service.

Within each process, one activity will be selected for improvement: materials usage for production and sustaining engineering for customer service (sustaining engineers are responsible for redesigning products based on customer needs and feedback). Value- added standards are identified for each activity (the level of efficiency so that no waste exists). For materials usage, the value-added standard calls for six kilograms per unit of output (although the plastic products differ in shape and function, their size-as measured by weight-is uniform). The value-added standard is based on the elimination of all waste due to defective moulds. The standard price of materials is $5 per kilogram.

For sustaining engineering, the standard is 58 percent of current practical activity capacity. This standard is based on the fact that about 42 percent of the complaints have to do with design features that could have been avoided or anticipated by the company.

Current practical capacity (at the end of 2013) is defined by the following requirements: 6,000 engineering hours for each product group that has been on the market or in development for five years or less and 2,400 hours per product group of more than five years. Four product groups have less than five years' experience, and 10 product groups have more. Each of the 24 engineers is paid a salary of $60,000. Each engineer can provide 2,000 hours of service per year. No other significant costs are incurred for the engineering activity.

Actual materials usage for 2014 was 25 percent above the level called for by the Value-added standard; engineering usage was 46,000 hours. A total of 80,000 units of output were produced. Bob and the operational managers have selected some improvement measures that promise to reduce non-value-added activity usage by 40 percent in 2015. Selected actual results achieved for 2015 are as follows:

Units produced - 80,000

Materials used - 584,800

Engineering hours - 35,400

The actual prices paid for materials and engineering hours are identical to the standard or budgeted prices.

Required:

1. For 2014, calculate the non-value-added usage and costs for materials usage and sustaining engineering.

2. Using the budgeted improvements, calculate the expected activity usage levels for 2015. Now, calculate the 2015 usage variances (the difference between the expected and actual values), expressed in both physical and financial measures, for materials and engineering. Comment on the company's ability to achieve its targeted reductions. In particular, discuss what measures the company must take to capture any realized reductions in resource usage.

Accounting Basics, Accounting

  • Category:- Accounting Basics
  • Reference No.:- M92398117
  • Price:- $25

Priced at Now at $25, Verified Solution

Have any Question?


Related Questions in Accounting Basics

Question - what are the steps to find the expected stock

Question - What are the steps to find the expected stock value in 5 years if it is expected to pay $4.5 per share next year, required return is 12.2 percent and the growth rate is 3.4 percent?

Thinking of the middle east identify where you encounter

Thinking of the Middle East, identify where you encounter products, services, or food items that should be relatively uniform and are based on standard inputs or costs. Identify the items, their standard components, and ...

Question - cosos internal control - integrated framework

Question - COSO's Internal Control - Integrated Framework discusses technology general controls and application controls. What are technology general controls and application controls? How do technology general controls ...

Question - stewart company purchases store supplies for

Question - Stewart Company purchases store supplies for $2,700, paying 20% of the amount due in cash and agreeing to pay the balance at a later date. Required: What is the effect of this transaction on individual asset a ...

Question - suppose the interest rate is 83 apr with monthly

Question - Suppose the interest rate is 8.3% APR with monthly compounding. What is the present value of an annuity that pays $ 115 every three months for six years if rounded to the nearest cent?

Question - kramer corp reported the following sale and

Question - Kramer Corp. reported the following sale and purchase transactions related to a specific product in January 2017: Date Transaction Quantity Unit Cost Unit Sales Price Jan 01 Beginning inventory 5 $90 Jan 03 Sa ...

Question - on april 1 2019 austin corporation issued 300000

Question - On April 1, 2019, Austin Corporation issued $300,000 of 10% bonds at 105. Each $1,000 bond was sold with 25 detachable stock warrants, each permitting the investor to purchase one share of common stock for $17 ...

Question transfer pricing is the pricing of assets funds

Question: Transfer pricing is the pricing of assets, funds, services, etc., transferred among related organizations. Using your textbook, the Argosy University online library resources, and the Internet, conduct research ...

Question - kiddie world uses a periodic inventory system

Question - Kiddie World uses a periodic inventory system and the retail inventory method to estimate ending inventory and cost of goods sold. The following data are available for the quarter ending September 30, 2018:   ...

Question - on january 1 eastern college received 1370000

Question - On January 1, Eastern College received $1,370,000 from its students for the spring semester that it recorded in Unearned Tuition and Fees. The term spans four months beginning on January 2 and the college spre ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As