Mai Ling is evaluating a mining prospect. Leasing the land and the mineral rights from the government will cost $450K to win the lease and $50K annually as the lease payment for 22 years. In the first year developing the deposit will require $300K for initial planning and $400K for core drilling to better delineate the deposit.

In year 2, $1.25M will be required to purchase and install the drag-line. Its salvage value will be zero, and it will cost $200K per year to operate. Roads and buildings will cost another $950K in year 1 and $175K annually. At the start of year 3, the following equipment will be purchased: 16 off-road dump trucks for $150K each, 6 pickups for $25K each, 4 loaders for $190K each, and 2 conveyors for $325K each. The pickups will last for 5 years, and the other equipment will last for 10 years. Each has a salvage value estimated to be 10% of its first cost. Annual operating and maintenance costs are estimated to be 35% of the first cost for the vehicles and 20% for the conveyors.

In year 3, the production volume will be 3M tons. This will increase to 4M tons for years 4 through 6, but then it will fall by 2% per year. The initial yield from the deposit will be 1.3%, but this will fall by .04% per year. The minerals are worth $1.80 per pound now, which is expected to increase by $.03 per year

If the firm's interest rate is 9%, find the project's PW.

Business Economics, Economics

  • Category:- Business Economics
  • Reference No.:- M92635703

Have any Question?


Related Questions in Business Economics

Standards drive instruction therefore how do standards

Standards "drive instruction," therefore, how do standards influence curriculum planning?

Explain how the application of the pdca cycle can support a

Explain how the application of the PDCA cycle can support a competitive strategy of low cost leadership.

Ford motors expects a new hybrid-engine project to produce

Ford Motors expects a new? Hybrid-engine project to produce incremental cash flows of $ 95 million each year and expects these to grow at 4?% each year. The upfront project costs are? $900 million and? Ford's weighted av ...

A five-year bond with a yield of 11 continuously compounded

A five-year bond with a yield of 11% (continuously compounded) pays an 8% coupon at the end of each year. a) What is the bond's price? b) What is the bond's duration? c) Use the duration to calculate the effect on the bo ...

Image manufacturing is an electronics manufacturer and

IMAGE Manufacturing is an electronics manufacturer and retailer. Its main products are Ultrabook computers, PCs and calculators. The current price of the Ultrabook is $ 600, the PC is $700 and the calculator is $30. This ...

According to kulish what is about the design of the euro

According to Kulish, what is about the design of the euro currency that lessens its appeal compared to prior national currencies?

How has the value of the euro changed compared to other

How has the value of the Euro changed, compared to other countries, over the past 10 years (since the Great Recession began)?

In lecture we discussed why the production possibilities

In lecture we discussed why the production possibilities frontier (the boundary of the production possibilities set) is bowed 'outwards'. When might the production possibilities set be bowed 'inwards'? Give an example of ...

In 2013 gallup conducted a poll and found a 95 confidence

In 2013, Gallup conducted a poll and found a 95% confidence interval of the proportion of Americans who believe it is the government's responsibility for health care. Give the statistical interpretation. I do not underst ...

The standard deviation of the number of video game as

The standard deviation of the number of video game A's outcomes is 0.5479, while the standard deviation of the number of video game B's outcomes is 0.2498. Which game would you be likely to choose if you wanted players t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As