A project was planned using PERT with three time estimates. Times expected completion times of the project was determined to be 36 weeks. The variance of critical path is 25

A) What is the probability that the project will be finished in 32 weeks or less?

B) What is the probability that the project takes longer than 36 weeks?

C) What is the probability that the project will be finished in 42 weeks?

D) What is the probability that the project will take longer than 45 weeks?

E) The project manager wishes to set the due date for the completion of the project so that there is a 90% chance of finishing on schedule. Thus, there would only be a 10% chance the project would take longer than this due date what should this due date be?

Business Economics, Economics

  • Category:- Business Economics
  • Reference No.:- M91671702

Have any Question?


Related Questions in Business Economics

What are the implications of the shift from medical care to

What are the implications of the shift from medical care to the focus on overall health conditions?

In an inquiry into the nature and causes of the wealth of

In an inquiry into the nature and causes of the wealth of nations, Adam Smith listed three reasons for productivity to increase with specialization. What are these three reasons?

In a survey ofnbsp3153nbspadultsnbsp1407nbspsay they have

In a survey of 3153 adults, 1407 say they have started paying bills online in the last year. Construct a? 99% confidence interval for the population proportion. Interpret the results. A? 99% confidence interval for the p ...

Bullwhy hasnt health care in australia been entirely

• Why hasn't health care in Australia been entirely privatised, according to Boxall and Gillespie? • Should health care (in Australia) be wholly privatised? Do you think it will be in the future?

We live in kapurkua a small island in the mediterranean

We live in Kapurkua, a small island in the mediterranean between Greece and Spain (no, it doesn't really exist so don't look it up in the map). In the island we produce and consume canoes, latreks (a garment that is comf ...

Thirty-five percent of teens buy soda pop at least once

Thirty-five percent of teens buy soda (pop) at least once each week. Eleven kids are randomly selected. The random variable represents the number of these kids who purchase soda (pop) at least once each week. For this to ...

Find the mean and the standard deviation of a binomial

Find the mean and the standard deviation of a Binomial Distribution with n = 65 and p = 0.32 Mean = 24; Stand. Deviation= 4.1 Mean = 20.8; Stand. Deviation= 3.76 Mean = 28; Stand. Deviation= 3.66 Mean = 21.8; Stand. Devi ...

In an effort to check the quality of their cell phones a

In an effort to check the quality of their cell? phones, a manufacturing manager decides to take a random sample of 10 cell phones from? yesterday's production? run, which produced cell phones with serial numbers ranging ...

According to the center for disease control the mean total

According to the center for Disease Control, the mean total cholesterol for men between the ages of 20-29 is 180 milligrams per deciliter with a standard deviation of 36.2. A healthy total cholesterol level is less than ...

You have to negotiate a contract with a businessperson from

You have to negotiate a contract with a businessperson from France. How will you approach them? How does the French communication pattern and listening habit differ from your own culture?

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As