A manufacturer wishes to produce 1,000 metal frames.
A setup time of 5 hours is required at the beginning of each batch of 20 frames.
Find the setup time per frame in HOURS. hours
Find the total setup time to produce the quantity needed.
If labor cost is $8/hour for setup, what is the total cost for the total quantity needed.