A company expected its annual overhead costs to be $ 600000 and direct labor costs to be $ 1000000. Actual overhead was $ 580000 and actual labor costs totaled $ 1100000. how much is the company's predetermined overhead rate to the nearest rent?
a. $ 0.58
b.$0.53
c.$0.60
d.$0.55