1) The cost to prepare bottom-up estimates will typically run how much more than the costs to prepare the top-down estimates?
A. About the same
B. About twice as much
C. About three times as much
D. About four times as much
E. About five times as much]

2) Resource shortages, in the form of people, equipment, or materials, is a good example of
A. Hidden interaction costs
B. Things going wrong on a project
C. Normal conditions not applying
D. Changes in project scope
E. None of these are correct

3) The accuracy of top-down estimates will typically be in the range of
A. Minus 50% to plus 50%
B. Minus 0% to plus 75%
C. Minus 20% to plus 60%
D. Minus 35% to plus 35%
E. Minus 10% to plus 30%

4) Design flaws being revealed after the fact, extreme weather conditions, and accidents occurring are examples of:
A. Hidden interaction costs
B. Things going wrong on a project
C. Normal conditions not applying
D. Changes in project scope
E. None of these are correct

5) In practice, estimating processes are frequently classified as
A. Top down/bottom up
B. Rough/polished
C. Precise/order of magnitude
D. Draft/final
E. Both A and B are correct

6) Which of the following is a good condition for top-down estimating?
A. Cost and time important
B. Fixed price contract
C. Customer wants details
D. Internal, small project
E. All of these are good conditions for top-down estimating

7) Janet is forecasting how much money her department needs to support a new project. She estimates that two people and $25,000 in expenses will cover her needs. Because management typically insists on reducing forecasts by 20 percent, she increases her estimates to allow for that reduction. Which of the following factors is illustrated in this situation?
A. Padding estimates
B. Planning horizon
C. Project structure
D. People
E. Organization culture

8) A/an _________ activity has more than one dependency arrow flowing from it.
A. Parallel
B. Critical path
C. Burst
D. Merge
E. Independent

9) ________ activities are to be completed immediately following a particular activity.
A. Merge
B. Burst
C. Predecessor
D. Successor
E. Critical

10) When translated into a project network, a work package will become
A. A single activity
B. One or more activities
C. A milestone
D. A critical path
E. An arrow

11) Activities which can take place at the same time are termed
A. Parallel activity
B. Critical path
C. Burst activity
D. Merge activity
E. Independent activity

12) The minimum amount of time a dependent activity must be delayed to begin or end is referred to as:
A. Hammock
B. Laddering
C. Lag
D. Cushion
E. Buffer

13) The minimum amount of time a dependent activity must be delayed to begin or end is referred to as:
A. Hammock
B. Laddering
C. Lag
D. Cushion
E. Buffer

14) Which of the following is not one of the steps in the risk management process?
A. Risk response development
B. Risk assessment
C. Risk identification
D. Risk tracking
E. Risk response control

15) One of the keys to success in risk identification is
A. Critical thinking
B. Optimism
C. Pessimism
D. A "can do" attitude
E. All of these are correct

16) The 1999 NASA Mars Climate Orbiter is an example of
A. Disaster avoidance through proactive risk management
B. Murphy's Law
C. Proper use of critical thinking
D. Mismanaged risk control
E. Using historical records to assess risk

17) A list of questions that address traditional areas of uncertainty on a project is termed a risk
A. Risk profile
B. Questionnaire
C. Research
D. Query
E. Checklist

18) One common mistake made early in the risk identification process is to
A. Not all possibilities are considered
B. Participants are over-optimistic
C. Participants are over-pessimistic
D. Focus on objectives and not on the events that could produce consequences.
E. Too much attention is given to past events

19) In the beginning the focus of risk management should be on risks that
A. Impact the whole project
B. Impact the critical path
C. Are known
D. Have the greatest cost impact
E. Have the greatest schedule impact

20) More common problems associated with managing multiproject resources include all of the following except
A. Inefficient resource utilization
B. Delays in one project cause delays in other projects
C. Reducing "downtime" created by lack of tasks to perform
D. Resource bottlenecks
E. All of these are common problems

21) Which of the following is not one of the types of project constraints?
A. Physical
B. Technical
C. Resource
D. Time
E. All of these are types of project constraints

22) In a resource-constrained project, the first priority in assigning resources is usually given to activities with the
A. Smallest duration
B. Least slack
C. Most slack
D. Lowest identification number
E. Highest cost

23) . If resources are not adequate to meet peak demands, the resulting reschedule is termed
A. Resource-constrained scheduling
B. Time-constrained scheduling
C. Mandatory leveling
D. Project resource adjustment
E. Allocation

24) Susan is to conduct environmental testing but the chamber cannot hold all the equipment that she wants to test. This is an example of a _________ constraint.
A. Physical
B. Technical
C. Resource
D. Scheduling
E. Time

25) . In a resource-constrained project the third priority in assigning resources is usually given to activities with the
A. Smallest duration
B. Least slack
C. Most slack
D. Lowest identification number
E. Highest cost

Accounting Basics, Accounting

  • Category:- Accounting Basics
  • Reference No.:- M91590693
  • Price:- $30

Priced at Now at $30, Verified Solution

Have any Question?


Related Questions in Accounting Basics

Question - hardcastle ltd had sales of 3 000 000 and net

Question - Hardcastle Ltd. had sales of $3 000 000 and net operating income of $900 000. Operating assets during the year averaged $1 500 000. The manager of Hardcastle is considering the purchase of a new machine which ...

Question - fundamentals of revenue recognition - respond to

Question - Fundamentals of Revenue Recognition - Respond to the questions related to the following statements. 1. A wholly unperformed contract is one in which the company has neither transferred the promised goods or se ...

Question - in 2017 wildhorse corporation had net cash

Question - In 2017, Wildhorse Corporation had net cash provided by operating activities of $569,000, net cash used by investing activities of $965,000, and net cash provided by financing activities of $592,000. At Januar ...

Question - crane company had 590000 shares of common stock

Question - Crane Company had 590000 shares of common stock outstanding on January 1, issued 890000 shares on July 1, and had income applicable to common stock of $2930000 for the year ending December 31, 2018. Earnings p ...

Question - on november 1 2009 tims toys borrows 30000000 at

Question - On November 1, 2009, Tim's Toys borrows $30,000,000 at 9% to finance the holiday sales season. The note is for a six-month term and both principal and interest are payable at maturity. What should be the balan ...

Question - assume the following is the stockholders equity

Question - Assume the following is the stockholders' equity section of the 2016 Merck & Co., Inc., balance sheet. Stockholders' Equity ($ millions 2016 Common stock, one cent par value; Authorized-5,400,000,000 shares; I ...

Qestion - a racing bike is listed for 129344 less 18 9

Question - A racing bike is listed for $1293.44 less 18 %, 9 %, and 3%. a. What is the net price? b. What is the total amount of discount that was allowed? c. What is the exact single rate of discount that was allowed?

Problem - one of the worst cases of aquatic pollution

Problem - One of the worst cases of aquatic pollution occurred on March 24, 1989, when the oil tanker Exxon Valdez ran into a reef in Prince William Sound, Alaska, spilling 11 million gallons of oil into the sea, with de ...

Question - x company estimates the following for its three

Question - X Company estimates the following for its three products, A, B, and C, for 2018:   A B C Revenue $47,460 $24,303 $63,666 Total variable costs 29,400 18,224 26,136 Fixed costs in 2018 are expected to be $19,800 ...

Questions -q1 isaiah an nba point guard is advised by his

Questions - Q1. Isaiah an NBA point guard, is advised by his physician to install a Jacuzzi in his residence since he is afflicted with a back problem incurred after years of running up and down the court. The cost of in ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As